Who We Are

About

A local deck builder serving homeowners across Pinellas Park, FL.

Home › About Us
Ashwood Deck Company crew at work, deck builder in Pinellas Park, FL
Our Story

How We Ended Up Building Decks

We build and repair decks for homeowners around Pinellas Park, mostly people who want somewhere to actually sit outside without worrying about a board giving way. Deck work is specific, footings, joist spans, fastener choice, and that's the part we spend the most time getting right. A lot of what gets us called out is a deck that was built fast and cheap by someone else.

If you're on this page, there's a decent chance a board feels spongy underfoot, or a railing moves more than it should when you lean on it. We pull back the decking to check the joists and ledger board before replacing anything, since a new board over a rotted joist just hides the problem for another year. We flash the ledger where it meets the house, since that's the single spot most decks in this area start leaking and rotting from the inside.

10+
Years Experience
500+
Projects Completed
11
Cities Served
Why Choose Us

What you get when you hire us

None of this is complicated. It is mostly just doing what we said we would do.

Licensed and Insured

Every job is covered by liability insurance and we carry workers' comp on our crew. Ask for certificates before we start, we hand them over without hesitation.

Straight Written Quotes

We walk the site, measure the span, and write out what lumber or composite the job takes before we ever cut a board. No vague numbers, no add-ons once we've started.

Our Own Crew

We don't sub out the framing to one crew and the railing to another. The same people who set your posts are the ones screwing down the decking.

Permit Handling

Pinellas County requires a permit for most deck work over 30 inches off the ground, and we deal with that paperwork directly. We schedule the framing inspection before the decking goes down, so nothing gets covered up that an inspector has to see.

Material Options

Pine costs less up front but has to be restained every couple years in this sun. Composite costs more but we've seen it outlast pine twice over near the coast.

Clean Job Site

Deck demo leaves a lot of small stuff behind, bent nails, screw tips, offcuts. We run a magnetic sweep before we leave so you're not finding metal in bare feet later.

Common Questions

Things people ask us

Questions about how we work and who's doing the job.

How long have you been building decks?
Deck construction and repair is the core trade here, with experience across pressure-treated pine, composite, and PVC decking systems. The focus stays narrow, on deck-specific work, rather than spreading across general home remodeling.
Do you use your own crew or subcontractors?
Framing, decking, and railing work is done by the same crew from start to finish on most jobs. Specialty add-ons like a screen enclosure may involve a separate licensed contractor, coordinated directly rather than handed off.
Can I see photos of decks you've built before?
Photos of past deck installations and repairs are available on request, showing framing, footing work, and finished railing details. Seeing the structural side, not just the finished surface, is usually what helps most when comparing contractors.
Why choose a smaller deck builder instead of a large remodeling company?
A smaller deck-focused operation means direct contact with the person doing the work, not a sales rep followed by a rotating crew. Decisions about footing placement or board layout get made on site, not relayed through layers of office staff.
Where is Ashwood Deck Company based?
Ashwood Deck Company is based in Pinellas Park, Florida, and serves surrounding Pinellas County communities. Being local means familiarity with county permit requirements and typical ground conditions in the area.
How far in advance do I need to book?
Scheduling generally runs two to four weeks out depending on the season, with spring and early fall being the busiest stretch for new deck builds. Repair work usually gets worked in faster since it doesn't require the same permit lead time.
Do you clean up the job site after a deck project?
Old decking, offcuts, and packaging get hauled off at the end of each work day, not left piled up until the job finishes. A final walk-through includes a sweep for loose screws and nails before the crew leaves for good.
What happens if something gets damaged during the deck work, like a fence or landscaping?
Liability insurance covers accidental damage to property during construction, and any issue gets addressed directly rather than argued over. Certificates of insurance are available before work starts, for anyone who wants that on file.
Will you finish a deck another contractor started or left unfinished?
Picking up a partially built deck is possible, but it starts with an inspection of what's already in place, footings, framing, and fastener choice, before agreeing to continue it. Work that doesn't meet code or is structurally unsound gets flagged before anything new is added on top of it.
How can I tell if deck work is being done correctly?
Proper footing depth, joist spacing matched to the decking material, and flashing on the ledger board where it meets the house are the main things an inspector checks and a homeowner can ask about. A contractor willing to explain those details, rather than brush past the question, is usually a good sign.

Got something that needs doing?

Free estimate, a price in writing, and work we stand behind.

Call (352) 780-6727