What We Do

Services

Every job below covers Pinellas Park and the surrounding area.

Home › Services

Everything we take on

Every job below is one we do ourselves across Pinellas Park.

Deck Installation

We frame new decks with pressure-treated pine or composite over poured footings, sized to the actual load, not a guess. Beam and joist spacing gets set to span tables for the decking material you pick, not whatever was easiest to cut.

Deck Repair

Most repair calls start with a soft spot in the decking or a rail that moves when you lean on it. We pull boards back to find out if the joist underneath rotted or if it's just the board, then fix the actual problem instead of screwing a new board over bad wood.

Deck Staining & Sealing

Pressure-treated pine has to dry out for a few weeks before stain will take, and moisture content gets checked before staining starts. We use a penetrating sealer rated for high UV, since a cheap coating will peel in one Florida summer.

Custom Deck Design

Multi-level decks, built-in benches, pergola tie-ins, we draw it out before we touch a board. We size footings and beams to the finished layout, not a standard plan, so the structure matches what you actually asked for.

Composite Decking Installation

Composite boards expand and contract more than wood with heat, so gapping and fastener spacing has to be dead on or the deck buckles by year two. We hidden-fastener most composite jobs so there's no screw heads showing across the surface.

Deck Resurfacing

If the frame underneath is still solid, we'll strip off old decking and lay new boards without rebuilding the whole structure. We check every joist for soft spots first, since there's no point putting new boards over rot.

Deck Railing Installation & Repair

Florida code calls for 36-inch railing height on most residential decks and baluster spacing under 4 inches. We rebuild loose rail posts by bolting through the rim joist instead of just screwing into the face, which is usually why they were wobbling in the first place.

Deck Demolition & Removal

Old decks come down board by board so we can check what's salvageable and haul off what isn't. We cut out old post footings below grade rather than leaving concrete stubs in your yard.

Screened-In Deck & Porch Combos

We frame the deck to carry the extra load of a screen enclosure before the screen company ever shows up. Getting the ledger and footings right at this stage saves a headache once the enclosure contractor comes behind us.

Pergolas & Deck Shade Structures

A pergola or shade structure bolts onto or beside the deck frame, so we size the posts and footings together instead of adding one as an afterthought. Western or southern-facing decks usually call for this most, given how much sun they take by mid-afternoon.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Pinellas Park, FL

These are the areas where deck installation and repair get scheduled regularly.

Pinellas Park, FL
Tampa, FL
St. Petersburg, FL
Clearwater, FL
Largo, FL
Palm Harbor, FL
Dunedin, FL
Seminole, FL
Safety Harbor, FL
Oldsmar, FL
Gulfport, FL
Common Questions

Things worth asking

Common questions once a deck project is actually underway.

Do I need a permit to build a deck in Pinellas County?
Most decks attached to a house or built more than 30 inches above grade require a building permit in Pinellas County. The permit covers footing depth, joist spacing, and railing height, and a framing inspection usually happens before the decking boards go down.
How long does it take to build a deck?
A standard single-level deck usually takes one to two weeks from the start of framing to the final board, weather and permit timing aside. Multi-level decks or ones with a screen enclosure tacked on take longer, closer to three to four weeks.
Can a deck be built to a specific budget?
Budget limits usually shift material choice first, pressure-treated pine instead of composite, or a simpler railing instead of a custom design. Size and height off the ground matter more than finish choice, so those get discussed early if the number has to come down.
What kind of guarantee comes with the deck work?
Workmanship is covered for a set period after completion, with details spelled out in the written quote. Material warranties are separate and come from the lumber mill or composite manufacturer, typically 10 to 25 years depending on the product.
Who do I talk to during the project, a project manager or the crew directly?
Questions during the job go straight to the crew lead on site, not a separate office contact. That keeps the answer accurate since the person answering is standing next to the work.
What materials do you use for decking?
Pressure-treated southern yellow pine is the most common choice, cheaper upfront but has to be restained every two to three years in Florida sun. Composite and PVC decking cost more initially but don't rot, splinter, or require refinishing, which matters more the closer the deck is to salt air.
Can I still use my yard or house while the deck is being built?
The yard stays accessible during most of the build except right around the active work area, and the house itself isn't affected unless the deck ties into an existing door or slider. Noise from saws and nail guns is normal during framing hours.
Do I need to do anything to prepare the yard before deck construction starts?
Clearing furniture, grills, and potted plants away from the build area helps the crew move faster on day one. Sprinkler heads and buried lines near the footing locations are worth marking out ahead of time if their location isn't obvious.
What happens if you find rot or damage once the old deck comes down?
Hidden rot in a ledger board or support post shows up sometimes once old decking is pulled up, and it gets flagged before replacement work continues. Any change to the scope because of hidden damage is discussed and priced before it's done, not added to the final bill as a surprise.
How do I maintain a new deck once it's finished?
Pressure-treated pine requires cleaning and restaining roughly every two to three years to keep water from getting into the wood grain. Composite decking requires occasional washing to clear pollen and mildew film but no staining or sealing at all.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (352) 780-6727